CONSTRUCTION OF COVERED LINKWAY BETWEEN BLOCK 69 BEDOK SOUTH AVENUE 3 AND BLOCK 70 BEDOK SOUTH ROAD AND UPGRADE EXISTING COVERED LINKWAY FROM BLOCK 124 BEDOK NORTH ROAD TO BUS-STOP FOR EAST COAST TOWN COUNCIL (CONTRACT PERIOD – 08 MONTHS) (✉ : AA-24-019-EC@emservices.com.sg)