Tenders

Advertisement Date Closing Date Client Project Title Eligibility & Financial Grades
23/08/201913/09/2019MARSILING-YEW TEE TOWN COUNCILSUPPLY, INSTALLATION, CONTENT PRODUCTION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT GROUND FLOOR LIFT LOBBIES OF HDB BLOCKS AND OTHER HIGH TRAFFIC AREAS IN MARSILING-YEW TEE TOWN FOR 5 YEARS WITH OPTION TO EXTEND FOR ANOTHER 3 YEARS FOR MARSILING-YEW TEE TOWN COUNCIL (RE-TENDER)Experienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor / Installer possessed WSHC’s bizSAFE Level 3 & above are also eligible to participate.
23/08/201913/09/2019PASIR RIS-PUNGGOL TOWN COUNCILREPAIRS AND REDECORATION TO 26 BLOCKS AT BLOCK 207A TO 207D, 208A TO 208C, 209A TO 209C, 210A TO 210C, 211A TO 211D, 212A TO 212B, 213A TO 213C, 208, 209, 211 AND 212 PUNGGOL PLACE / WALK FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Repairs & Redecoration (CR09) - $4 Million & above (L3) (Tenderers are required to furnish a joint warranty for the paintwork)
23/08/201913/09/2019JALAN BESAR TOWN COUNCILIMPROVEMENT AND UPGRADING WORKS TO EXISTING FACILITIES AT VARIOUS SITES FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
23/08/201913/09/2019CHUA CHU KANG, JURONG-CLEMENTI AND WEST COAST TOWN COUNCILSTERM CONTRACT FOR RAT CULLING SERVICES FOR THE PERIOD 1 NOV 2019 TO 31 OCT 2021 (ZONE 4) FOR CHUA CHU KANG, JURONG-CLEMENTI AND WEST COAST TOWN COUNCILSPest Control (MW04) - $1.3 Million & above (L2)
23/08/201913/09/2019JALAN BESAR, MARINE PARADE AND TANJONG PAGAR TOWN COUNCILSTERM CONTRACT FOR RAT CULLING SERVICES FOR THE PERIOD 1 NOV 2019 TO 31 OCT 2021 (ZONE 3) FOR JALAN BESAR, MARINE PARADE AND TANJONG PAGAR TOWN COUNCILSPest Control (MW04) - $1.3 Million & above (L2)
23/08/201917/09/2019WEST COAST TOWN COUNCILREPLACEMENT OF FIBRE-GLASS REINFORCED POLYESTER (FRP/GRP) SECTIONAL WATER TANKS TO 3 BLOCKS AT BLOCK 185, 186 & 206 BOON LAY AVENUE / DRIVE FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $0.65 Million & above (L1)
23/08/201919/09/2019TAMPINES TOWN COUNCILELECTRICAL REWIRING TO 32 BLOCKS AT BLOCK 701 TO 707, 709 TO 716, 721, 725, 732 TO 734, 842B TO 842H & 856B TO 856F TAMPINES STREET 71/82 FOR TAMPINES TOWN COUNCIL (CONTRACT PERIOD – 15 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
23/08/201918/09/2019TAMPINES TOWN COUNCILELECTRICAL REWIRING TO 21 BLOCKS AT BLOCK 497A TO 497D, 497F TO 497H & 497J, 498A, 498B, 498D TO 498H, 498J, 498L & 498M TAMPINES STREET 45 & BLOCK 510, 512A & 513 TAMPINES CENTRAL 1 FOR TAMPINES TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
23/08/201917/09/2019TAMPINES TOWN COUNCILELECTRICAL REWIRING TO 50 BLOCKS AT BLOCK 316 TO 343 & 345 TO 351, BLOCK 357 TO 370 & 367A TAMPINES STREET 32/33/34 FOR TAMPINES TOWN COUNCIL (CONTRACT PERIOD – 24 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
23/08/201920/09/2019JALAN BESAR TOWN COUNCILELECTRICAL REWIRING TO 22 BLOCKS AT BLOCK 46 & 48 BENDEMEER ROAD, BLOCK 54 CHIN SWEE ROAD, BLOCK 63, 64, 65 & 67 KALLANG BAHRU, BLOCK 82 TO 86, 93 TO 101 WHAMPOA DRIVE & BLOCK 568 GANGES AVENUE FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 13 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
16/08/201910/09/2019WEST COAST TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANT TO 75 BLOCKS FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Mechanical Engineering (ME11) OR Mechanical Equipment, Plant & Machinery (SY08) - $4 Million & above (L3)
16/08/201910/09/2019SEMBAWANG TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANT TO 97 BLOCKS FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Mechanical Engineering (ME11) OR Mechanical Equipment, Plant & Machinery (SY08) - $4 Million & above (L3)
16/08/201910/09/2019JALAN BESAR TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANT TO 7 BLOCKS AT BLOCK 813, 815, 816 JELLICOE ROAD AND BLOCK 16-19 JALAN TENTERAM FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 4 MONTHS)Mechanical Engineering (ME11) OR Mechanical Equipment, Plant & Machinery (SY08) - $0.65 Million & above (L1)
16/08/201906/09/2019EAST COAST-FENGSHAN, PASIR RIS-PUNGGOL AND TAMPINES TOWN COUNCILSTERM CONTRACT FOR RAT CULLING SERVICES FOR THE PERIOD 1 NOV 2019 TO 31 OCT 2021 (ZONE 2) FOR EAST COAST-FENGSHAN, PASIR RIS-PUNGGOL AND TAMPINES TOWN COUNCILSPest Control (MW04) - $1.3 Million & above (L2)
16/08/201906/09/2019ANG MO KIO, BISHAN-TOA PAYOH, HOLLAND-BUKIT PANJANG AND NEE SOON TOWN COUNCILSTERM CONTRACT FOR RAT CULLING SERVICES FOR THE PERIOD 1 NOV 2019 TO 31 OCT 2021 (ZONE 1) FOR ANG MO KIO, BISHAN-TOA PAYOH, HOLLAND-BUKIT PANJANG AND NEE SOON TOWN COUNCILSPest Control (MW04) - $1.3 Million & above (L2)
16/08/201906/09/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR THE PROVISION OF WORKMEN FOR THE PERIOD 1 JAN 2020 TO 31 DEC 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (RE- TENDER)Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $0.65 Million & above (L1)
09/08/201930/08/2019BISHAN-TOA PAYOH, EAST COAST-FENGSHAN, HOLLAND-BUKIT PANJANG, JALAN BESAR, PASIR RIS-PUNGGOL, TAMPINES, MARSILING-YEW TEE, NEE SOON, SEMBAWANG, TANJONG PAGAR AND WEST COAST TOWN COUNCILSSUPPLY OF ELECTRICITY TO CONTESTABLE PREMISES FOR THE PERIOD 1 JAN 2020 TO 31 DEC 2021All electricity retailers approved by Energy Market Authority
02/08/201927/08/2019NEE SOON TOWN COUNCILREPLACEMENT OF WATER PUMPSETS TO 47 BLOCKS & BOOSTER PUMPSETS TO 104 BLOCKS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $1.3 Million & above (L2)
02/08/201927/08/2019HOLLAND-BUKIT PANJANG TOWN COUNCILREPLACEMENT OF WATER PUMPSETS TO 26 BLOCKS AT BLOCK 173 GANGSA ROAD, BLOCK 437, 440, 442, 447-453 FAJAR ROAD / BUKIT PANJANG RING ROAD, BLOCK 201, 202, 204-206, 301-310 CLEMENTI AVENUE 4 / AVENUE 6 & REPLACEMENT OF BOOSTER PUMPSETS TO 26 BLOCKS AT BLOCK 515-532, 633C/D JELAPANG ROAD / SENJA ROAD, BLOCK 111, 113-115, 117, 118 CLEMENTI STREET 13 FOR HOLLAND-BUKIT PANJANG TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $0.65 Million & above (L1)
02/08/201923/08/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR ENFORCEMENT WORKS AT COMMON PROPERTY FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR TAMPINES TOWN COUNCILManagement Services (EPU/SER/30) - $1 Million & above (S5)
02/08/201923/08/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF SPORTS PARK INCLUDE FUTSAL, BASKETBALL AND GAME COURTS AT BLOCK 108A CANBERRA WALK AND COVERED LINKWAY AT BLOCK 575 TO 573A WOODLANDS DRIVE 16 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $4 Million & above (C1)
26/07/201920/08/2019NEE SOON TOWN COUNCILREPLACEMENT OF WATER PIPES TO 4 BLOCKS AT BLOCK 104A, 104B, 253, 253A ANG MO KIO STREET 11 / STREET 21 FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $0.65 Million & above (L1)
26/07/201920/08/2019SEMBAWANG TOWN COUNCILREPLACEMENT OF WATER PIPES TO 39 BLOCKS AT BLOCK 809, 810, 822, 823, 826, 827, 836, 839, 841, 844, 846, 851, 856-882 WOODLANDS STREET 81 / STREET 82 / STREET 83 / AVENUE 4 / AVENUE 9 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $1.3 Million & above (L2)
26/07/201923/08/2019SEMBAWANG TOWN COUNCILSUPPLY AND INSTALLATION OF SAFETY PROVISIONS AT ROOFTOP OF EXISTING HDB BUILDINGS FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Waterproofing Installation (CR13) - $4 Million & above (L3)
26/07/201916/08/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF SPORTS FACILITIES NEAR BLOCK 508C WELLINGTON CIRCLE ON STATE LAND IN SEMBAWANG DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)General Building (CW01) - $4 Million & above (C1)
17/07/201907/08/2019MARSILING-YEW TEE TOWN COUNCILUPGRADING OF 2 ELDERLY FITNESS CORNERS IN LIMBANG DIVISION (RE-TENDER) FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Sports, Recreational Equipment & Supplies (EPU/SPE/10) - $0.25 Million & above (S3)
17/07/201907/08/2019MARSILING-YEW TEE TOWN COUNCILCONSTRUCTION OF 2 COVERED LINKWAYS, 1 AWNING AND 3 BFA RAMPS IN MARSILING DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL(CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
12/07/201902/08/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF NEW COMMUNITY HALL AND UPGRADING TO EXISTING LINKWAY AT BLOCK 50 DORSET ROAD, NEW BFA RAMP / DROP-OFF PORCH / LINKWAY AT BLOCK 5 FARRER ROAD, BLOCK 171 STIRLING ROAD, BLOCK 125 BUKIT MERAH LANE 1, BLOCK 184 STIRLING ROAD, BLOCK 157 MEI LING STREET AND BLOCK 165 STIRLING ROAD, UPGRADING OF RESIDENTS’ CORNER AT BLOCK 161 MEI LING STREET AND FUNCTION CORNERS AT BLOCK 1A & 1F CANTONMENT ROAD FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)General Building (CW01) - $4 Million & above (C1)
28/06/201919/07/2019HOLLAND-BUKIT PANJANG TOWN COUNCILAPPOINTMENT OF ARCHITECT FOR DEVELOPMENT OF CONCEPT MASTER PLANOnly architectural firms whose principal architects are registered architects with the Board of Architects, Singapore OR Landscape Architect firms whose principal landscape architects are registered with the Singapore Institute of Landscape Architects are eligible to participate.
28/06/201926/07/2019TANJONG PAGAR TOWN COUNCILANCILLARY WORKS TO NEIGHBOURHOOD RENEWAL PROGRAMME TO 9 BLOCKS AT BLOCKS 116, 117, 121, 123, 124A, 124B, 125, 126 AND 126A BUKIT MERAH VIEW CUM REPAIRS & REDECORATION TO 14 BLOCKS AT BLOCKS 116 TO 119, 120, 121, 123, 124A, 124B, 125, 126 AND 128 TO 130 BUKIT MERAH VIEW FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 18 MONTHS)General Building (CW01) - $4 Million & above (C1) (Tenderers are required to furnish a joint warranty for the paintwork)
28/06/201919/07/2019TAMPINES TOWN COUNCILUPGRADING OF EXISTING BBQ PITS AT BLOCK 440, COMMUNITY GARDEN INCLUDING PROVISION OF STORAGE SPACE AT BLOCK 742, MULTI-PURPOSE COURT AT BLOCK 842, SENIOR CITIZENS’ CORNERS AT BLOCK 407 AND 161 TAMPINES STREET 43 / 72 / 82 / 41 / 12 AND CONSTRUCTION OF DROP-OFF POINT AT BLOCK 836/838 TAMPINES STREET 83 FOR TAMPINES TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $0.65 Million & above (C3)
21/06/201912/07/2019SEMBAWANG TOWN COUNCILTERM CONTRACT FOR MONITORING AND MAINTENANCE SERVICES OF BURGLAR ALARM SYSTEM (BAS) INCLUDING FIRE DECENTRALIZED ALARM MONITORING (DECAM) FOR SEMBAWANG TOWN COUNCIL FOR THE PERIOD 1 AUG 2019 TO 31 MAR 2023Communication & Security Systems (ME04) OR Fire Prevention and Protection Systems (ME06) - $0.65 Million & above (L1) OR Security Services (EPU/SER/43) - $0.25 Million & above (S3)
07/06/201928/06/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR ELECTRICAL WORKS AND MAINTENANCE OF LIGHTING TO CARPARKS AND AMENITIES FOR THE PERIOD 1 OCT 2019 TO 31 MAR 2022 FOR TAMPINES TOWN COUNCILElectrical Engineering (ME05) - $4 Million & above (L3) (For tenderers who are participating in both the Term Contracts for “Electrical Works and Maintenance of Lightings to Carparks and Amenities” and “Licensing of Electrical Installation” for Tampines Town Council, the Town Council reserves the right to only award either one of the Term Contracts to the same tenderer to prevent the conflict of interest between the two Term Contracts).
07/06/201928/06/2019SEMBAWANG TOWN COUNCILELECTRICAL REWIRING TO 37 BLOCKS AT BLOCK 822, 823, 826, 827, 836, 839, 841, 844, 846, 851 & 856 TO 882 WOODLANDS STREET 81 / 82 / 83 / AVENUE 4 / 9 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Electrical Engineering (ME05) – $4 Million & above (L3)
07/06/201928/06/2019SEMBAWANG TOWN COUNCILREPAIRS AND REDECORATION TO 51 BLOCKS AT BLOCK 753 TO 758 WOODLANDS AVENUE 4 (6 BLOCKS), BLOCK 759 TO 763 & 788 TO 793 WOODLANDS AVENUE 6 (11 BLOCKS), BLOCK 748 TO 752 WOODLANDS CIRCLE (5 BLOCKS), BLOCK 787B TO 788E & 774 TO 779 WOODLANDS CRESCENT (14 BLOCKS), BLOCK 769 TO 773 & 786B TO 786F WOODLANDS DRIVE 60 (10 BLOCKS) AND BLOCK 794 TO 798 WOODLANDS DRIVE 72 (5 BLOCKS) IN SEMBAWANG DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 18 MONTHS)Repairs & Redecoration (CR09) - $6.5 Million & above (L4) (Tenderers are required to furnish a joint warranty for the paintwork)
07/06/201928/06/2019SEMBAWANG TOWN COUNCILREPAIRS AND REDECORATION TO 46 BLOCKS AT BLOCK 606 TO 611, 632 TO 640, 643 TO 658 WOODLANDS RING ROAD, BLOCK 612 TO 618 WOODLANDS AVENUE 4, BLOCK 677 TO 680 WOODLANDS AVENUE 6 AND BLOCK 744 TO 747 WOODLANDS CIRCLE IN WOODLANDS DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Repairs & Redecoration (CR09) - $4 Million & above (L3) (Tenderers are required to furnish a joint warranty for the paintwork)
07/06/201928/06/2019MARSILING-YEW TEE TOWN COUNCILREPAIRS AND REDECORATION TO 16 BLOCKS AT BLOCK 669 TO 676, 670A, 671A, 672A/B, 673A/B, 674A AND 676A CHOA CHU KANG CRESCENT IN YEW TEE DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 11 MONTHS)Repairs & Redecoration (CR09) - $4 Million & above (L3) (Tenderers are required to furnish a joint warranty for the paintwork)
07/06/201928/06/2019MARSILING-YEW TEE TOWN COUNCILUPGRADING OF 2 ELDERLY FITNESS CORNERS IN LIMBANG DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Sports, Recreational Equipment & Supplies (EPU/SPE/10) - $0.25 Million & above (S3)
07/06/201902/07/2019JALAN BESAR TOWN COUNCILRENOVATION TO OFFICE AT BLOCK 70 GEYLANG BAHRU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 16 WEEKS)Interior Decoration & Finishing Works (CR06) - $1.3 Million & above (L2)
31/05/201916/07/2019TANJONG PAGAR TOWN COUNCILELECTRICAL REWIRING TO 24 BLOCKS AT BLOCK 1, 2, 4, 6, 8, 9, 10 HOLLAND CLOSE/AVE, BLOCK 7 & 7A COMMONWEALTH AVE, BLOCK 81, 87 & 88 REDHILL LANE/ CLOSE, BLOCK 6, 122, 123, 125 & 201 KIM TIAN PLACE/ ROAD, BLOCK 101 & 104 HENDERSON CRESCENT & BLOCK 129 TO 133 CLARENCE LANE FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 13 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
31/05/201921/06/2019MARSILING-YEW TEE TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AND OTHER HIGH TRAFFIC AREAS AT MARSILING-YEW TEE GRC FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARS FOR MARSILING-YEW TEE TOWN COUNCILExperienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor/Installer possessed WSHC’s bizSAFE Level 3 & above are also eligible to participate.
31/05/201921/06/2019JALAN BESAR TOWN COUNCILREROOFING TO 10 BLOCKS AT BLOCK 804 TO 806 KING GEORGE’S AVENUE, BLOCK 231 TO 233 BAIN STREET, BLOCK 261 TO 264 WATERLOO STREET (KAMPONG GLAM DIVISION) FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Waterproofing Installation (CR13) - $1.3 Million & above (L2)
24/05/201907/06/2019NEE SOON TOWN COUNCILCONSTRUCTION OF PAVILION WITH SEATING FACILITIES AND BBQ PITS AT OPEN SPACE IN FRONT OF BLOCK 770, SHELTERED BBQ CORNER WITH NEW FOOTPATH NEAR BLOCK 633/666, UPGRADING OF RESIDENT’S CORNER AT BLOCK 737 AND UPGRADING OF BLOCK DIRECTIONAL SIGNS IN NEE SOON CENTRAL FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $0.65 Million & above (C3)
24/05/201914/06/2019WEST COAST TOWN COUNCILSUPPLY, INSTALLATION, CONTENT PRODUCTION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT GROUND FLOOR LIFT LOBBIES OF HDB BLOCKS IN WEST COAST TOWN FOR 5 YEARS WITH OPTION TO EXTEND FOR ANOTHER 3 YEARS FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Experienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor/Installer possessed WSHC’s bizSAFE Level 3 & above are also eligible to participate.
24/05/201914/06/2019MARSILING-YEW TEE TOWN COUNCILREPLACEMENT OF WATER PIPES TO 12 BLOCKS AT BLOCK 401, 406, 408-410, 413-418 & 421 WOODLANDS STREET 41 FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $0.65 Million & above (L1)
24/05/201918/06/2019HOLLAND-BUKIT PANJANG TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANT TO 23 BLOCKS FOR BLOCK 177-180 LOMPANG ROAD, BLOCK 467, 470 SEGAR ROAD, BLOCK 607-609, 612, 617, 619-623, 650-656 SENJA ROAD / SENJA LINK / BUKIT PANJANG RING ROAD FOR HOLLAND–BUKIT PANJANG TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)Mechanical Engineering (ME11) OR Mechanical Equipment, Plant & Machinery (SY08) - $0.65 Million & above (L1)
24/05/201918/06/2019PASIR RIS-PUNGGOL TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANTS TO 77 BLOCKS FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Mechanical Engineering (ME11) OR Mechanical Equipment, Plant & Machinery (SY08) - $4 Million & above (L3)
24/05/201914/06/2019PASIR RIS-PUNGGOL TOWN COUNCILCONSTRUCTION OF DROP-OFF PORCH AND BARRIER-FREE RAMP AT BLOCK 128C PUNGGOL FIELD WALK, HIGH & LOW LINKWAY AT BLOCK 184B TO 185B RIVERVALE CRESCENT, EXTENSION OF COVERED LINKWAY BETWEEN BLOCK 200B & 200D TO PAVILION SENGKANG EAST ROAD AND EXISTING DROP-OFF POINT AT BLOCK 206A COMPASSVALE LANE, UPGRADING OF SENIOR CITIZENS’ CORNER AT BLOCK 185C RIVERVALE CRESCENT, EXISTING SENIOR CITIZENS’ CORNER TO RESIDENTS’ CORNER AT BLOCK 200D SENGKANG EAST ROAD AND RESIDENTS’ CORNER AT BLOCK 203C COMPASSVALE ROAD FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201907/06/2019NEE SOON TOWN COUNCILCONSTRUCTION AND UPGRADING OF 4 CHILDREN PLAYGROUNDS AND 2 FITNESS CORNERS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 1 TO 4 SITES : 5 MONTHS / 5 TO 8 SITES : 6 MONTHS)Sports, Recreational Equipment & Supplies (EPU/SPE/10) - $1 Million & above (S5)
17/05/201907/06/2019NEE SOON TOWN COUNCILCONSTRUCTION AND UPGRADING OF 4 DROP-OFF POINTS, 1 SHELTERED BBQ AREA, 2 COMMUNITY GARDENS, LOUVRES, BANNER STRUCTURES, FOOTPATH AND OPEN SPACES IN KEBUN BARU AND NEE SOON SOUTH DIVISIONS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201907/06/2019WEST COAST TOWN COUNCILCONSTRUCTION OF 8 HIGH/LOW LINKWAYS, 6 BICYCLE SHEDS, 1 RESIDENT’S CORNER, 1 DROP-OFF PORCH AT AYER RAJAH, WEST COAST AND PIONEER SMC FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201912/06/2019SEMBAWANG TOWN COUNCILCONSTRUCTION / UPGRADING OF COVERED LINKWAYS, BFA RAMPS, DROP-OFF POINTS, LINK BUILDINGS, PAVILIONS, AWNINGS, HARDCOURTS, BBQ AREAS AND SENIOR CITIZEN CORNERS IN SEMBAWANG GRC FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $4 Million & above (C1)
17/05/201911/06/2019MARSILING-YEW TEE TOWN COUNCILELECTRICAL REWIRING TO 21 BLOCKS AT BLOCK 601 TO 621 CHOA CHU KANG STREET 62 / NORTH 7 FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
17/05/201911/06/2019MARSILING-YEW TEE TOWN COUNCILELECTRICAL REWIRING TO 30 BLOCKS AT BLOCK 751 TO 771, 784 TO 792 CHOA CHU KANG NORTH 5 / 6 / STREET 54 / DRIVE FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
17/05/201907/06/2019MARSILING-YEW TEE TOWN COUNCILREROOFING TO 11 BLOCKS AT BLOCKS 107, 109, 111, 112, 114 TO 119 & 121 WOODLANDS STREET 13 & MARSILING RISE IN WOODGROVE DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Waterproofing Installation (CR13) - $1.3 Million & above (L2)
17/05/201907/06/2019MARSILING-YEW TEE TOWN COUNCILCONSTRUCTION / UPGRADING OF 2 COVERED LINKWAYS, 2 EXISTING PAVILIONS TO 1 COMMUNITY HALL, 1 EXISTING MULTI-PURPOSE HALL AND 3 BANNER STRUCTURES, INSTALLATION OF 13 NOTICE BOARDS AND 32 DOUBLE-TIER BICYCLE RACKS IN LIMBANG AND YEW TEE DIVISIONS FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201914/06/2019MARSILING-YEW TEE TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS IN MARSILING (N) AND MARSILING (S) FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR MARSILING-YEW TEE TOWN COUNCILHousekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
17/05/201913/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONES PR1, PR2, PR3, PR4 & SK1 FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR PASIR RIS-PUNGGOL TOWN COUNCILHousekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $4 Million & above (L3) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
17/05/201907/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR THE PROVISION OF WORKMEN FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCILHousekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $0.65 Million & above (L1)
17/05/201907/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR PROVISION OF SECURITY SERVICES FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCILSecurity Services (EPU/SER/43) - $0.5 Million & above (S4)
17/05/201907/06/2019JALAN BESAR TOWN COUNCILUPGRADING OF RESIDENTS’ CORNERS AT BLOCK 102 & 105 JALAN RAJAH AND BLOCK 5 BOON KENG ROAD, DROP-OFF PORCH NEAR BLOCK 34/35 JALAN BAHAGIA, COMMUNITY PARK WITH FITNESS CORNER NEAR BLOCK 32/33 JALAN BAHAGIA, HARDCOURT, STAGE & COMMUNITY GARDEN NEAR BLOCK 111 MCNAIR ROAD AND CONSTRUCTION OF COMMUNITY GARDEN NEAR BLOCK 23 BENDEMEER ROAD, BBQ PITS / SEATING AREA NEAR BLOCK 102 JALAN RAJAH & BLOCK 76 LORONG LIMAU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201907/06/2019JALAN BESAR TOWN COUNCILUPGRADING / CONSTRUCTION OF STREET SOCCER COURTS NEAR BLOCK 8 NORTH BRIDGE ROAD & BLOCK 25 JALAN BERSEH, UPGRADING OF COMMUNITY GARDEN CUM PAVILION NEAR BLOCK 25 JALAN BERSEH, CONSTRUCT SHELTERED RAMPS AT BLOCK 635/637/638 VEERASAMY ROAD AND UPGRADING TO MULTI-PURPOSE HALL AT BLOCK 28A KELANTAN ROAD FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201913/06/2019JALAN BESAR TOWN COUNCILIMPROVEMENT TO OPEN SPACE BETWEEN BLOCK 2/3 UPPER BOON KENG ROAD AND BETWEEN BLOCK 1/3 ST GEORGE’S ROAD, CONSTRUCTION OF A THERAPEUTIC GARDEN BETWEEN BLOCK 72/93 GEYLANG BAHRU, A SHELTER OVER EXISTING BASKETBALL COURT NEAR BLOCK 4C ST GEORGE’S LANE, A JOGGING TRACK AND SEATING FACILITIES NEAR BLOCK 48 LOWER DELTA ROAD, UPGRADING OF EXISTING COMMUNITY HALL AT BLOCK 12A TAMAN HO SWEE, CONVERT EXISTING RESIDENTS’ CORNER TO SEATING AREA AT BLOCK 114 GEYLANG ROAD AND UPGRADING OF EXISTING SPORTS FACILITIES NEAR BLOCK 222 LORONG 8 TOA PAYOH FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
17/05/201913/06/2019JALAN BESAR TOWN COUNCILCONSTRUCTION OF 6 COVERED WALKWAYS BETWEEN BLOCK 56/57 GEYLANG BAHRU, 49/63/51 SIMS PLACE / DRIVE, 45/46 BENDEMEER ROAD & 17/18 UPPER BOON KENG ROAD, FROM EXISTING WALKWAY AT BLOCK 2 JALAN KUKOH TO EXISTING PEDESTRIAN OVERHEAD BRIDGE AT HAVELOCK ROAD AND FROM BLOCK 1 JALAN KUKOH TO EXISTING COVERED WALKWAY AT BLOCK 2 JALAN KUKOH, UPGRADING OF EXISTING COVERED WALKWAY BETWEEN BLOCK 5 BANDA STREET AND BLOCK 4 SAGO LANE AND UPGRADING OF EXISTING ENTRANCE GATEWAY NEAR BLOCK 70 GEYLANG BAHRU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
10/05/201931/05/2019WEST COAST TOWN COUNCILREPAIRS AND REDECORATION TO 50 BLOCKS AT BLOCK 617-637, 679A-C TO 686A-C JURONG WEST CENTRAL 1 / STREET 61 / 64 / 65, BLOCK 20 TO 23, 37A (MARKET / FOOD CENTRE) TEBAN GARDENS ROAD AND 9 LINK BUILDINGS / MPH AT BLOCK 624B, 627A, 631A, 680, 681, 683, 685 JURONG WEST CENTRAL 1 / STREET 61 / 64 / 65, BLOCK 20A AND 21A TEBAN GARDENS ROAD FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Repairs & Redecoration (CR09) - $6.5 Million & above (L4) (Tenderers are required to furnish a joint warranty for the paintwork)
10/05/201904/06/2019SEMBAWANG TOWN COUNCILTERM CONTRACT FOR CONSERVANCY AND CLEANING WORKS FOR ZONES AR, CB, GB, SW & WL FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR SEMBAWANG TOWN COUNCILHousekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
10/05/201931/05/2019NEE SOON TOWN COUNCILCONSTRUCTION OF 13 COVERED WALKWAYS AT BLOCK 118 TO EXISTING COVERED WALKWAY, 121 TO BUS STOP, 265, 269, 272, 272 TO CHONGFU PRIMARY SCHOOL SIDE GATE, 224/225, 236 TO LINK PAVILION, 241 TO BUS-STOP, 246/248, 257, 318C TO 316C AND 675C TO 675D, DROP-OFF POINT AT BLOCK 101 AND UPGRADING OF PRECINCT MARKER IN FRONT OF BLOCK 202/203 YISHUN RING ROAD / STREET 11 / STREET 21 / STREET 22 / AVENUE 4 / AVENUE 5 / AVENUE 9 IN CHONG PANG AND NEE SOON EAST DIVISIONS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $4 Million & above (C1)
10/05/201931/05/2019JALAN BESAR TOWN COUNCILCONSTRUCTION OF 2 BANNER STRUCTURES AT BLOCK 112 & 113 LORONG 3 GEYLANG, IMPROVEMENT TO LIFT LOBBY / LANDING AT BLOCK 2A TO 2D, 3A TO 3D UPPER BOON KENG ROAD AND BLOCK 14 & 20 ST GEORGE’S ROAD AND REPLACEMENT OF EXISTING LETTERBOX AT HONG LIM COMPLEX BLOCK 531, 531A, 532, 533, 535, 536 AND 538 UPPER CROSS STREET FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 4 MONTHS)General Building (CW01) - $0.65 Million & above (C3)
03/05/201924/05/2019PASIR RIS-PUNGGOL TOWN COUNCILPROVISION OF CONCEPTUALISATION, EDITORIAL, CREATIVE SERVICES, PRINTING AND DELIVERY OF NEWSLETTERS FOR THE PERIOD 1 JAN 2020 TO 31 DEC 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 24 MONTHS)Stationery & Printing & Photocopying Services (EPU/STA/10) OR Advertising, Graphics Services (EPU/SER/18) OR Publishing and Bookbinding Services (EPU/SER/16) - $0.5 Million & above (S4)
03/05/201924/05/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR GRASSCUTTING, HORTICULTURE & ARBORICULTURE MAINTENANCE WORKS FOR THE PERIOD 1 OCT 2019 TO 31 MAR 2023 (ZONES 1 & 2) FOR TAMPINES TOWN COUNCILLandscaping (MW03) - $4 Million & above (L3)
03/05/201924/05/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR CONSERVANCY AND CLEANING WORKS FOR ZONES CG & TE FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR TAMPINES TOWN COUNCILHousekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $4 Million & above (L3) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
03/05/201924/05/2019EAST COAST-FENGSHAN TOWN COUNCILENGAGEMENT OF WSH CONSULTANT TO CARRY OUT ASSESSMENT AND MAKE RECOMMENDATION FOR THE INSTALLATION OF THE SAFETY PROVISIONS AT ROOFTOPS OF EXISTING HDB BUILDINGS FOR EAST COAST-FENGSHAN TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)The WSH Consultants must be from MOM’s approved listing for Learning Service Providers on Work-at-Height Course (Tenderers are required to produce the Certification for the purchase of tender document)
29/04/201921/05/2019TANJONG PAGAR TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT TANJONG PAGAR TOWN FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 1 YEARExperienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor/Installer possessed WSHC’s bizSAFE Level 3 & above are also eligible to participate
26/04/201917/05/2019HOLLAND-BUKIT PANJANG TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCKS 152 TO 155, 163 TO 168, 533 TO 545, 601 TO 606 GANGSA / PETIR / JELAPANG / SENJA / BUKIT PANJANG RING ROAD IN CASHEW DIVISION (CONTRACT PERIOD – 13 MONTHS)Repairs & Redecoration (CR09) - $6.5 Million & above (L4) (Tenderers are required to furnish a joint warranty for the paintwork)
26/04/201921/05/2019HOLLAND-BUKIT PANJANG TOWN COUNCILCONSTRUCTION / UPGRADING OF COVERED WALKWAYS, DROP-OFF PORCH, BFA RAMP AND STAIRCASE IN ZHENGHUA AND BUKIT TIMAH DIVISION (RETENDER) (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $4 Million & above (C1)
26/04/201917/05/2019NEE SOON TOWN COUNCILSUPPLY OF ELECTRICITY TO 70 ACCOUNTS FOR THE PERIOD 1 JUL 2019 TO 31 DEC 2021All electricity retailers approved by Energy Market Authority
19/04/201914/05/2019NEE SOON TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONE KB FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
19/04/201914/05/2019NEE SOON TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONE NSS FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
19/04/201914/05/2019NEE SOON TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONE NSE FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
19/04/201914/05/2019NEE SOON TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONE NSC FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
19/04/201914/05/2019NEE SOON TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONE CP FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Housekeeping, Cleansing, Desilting & Conservancy Service (MW02) - $13 Million & above (L5) AND Minimum Clean Mark Silver Award under “NEA Enhanced Clean Mark Accreditation Scheme”
19/04/201910/05/2019NEE SOON TOWN COUNCILUPGRADING OF EXISTING AMPHITHEATRE TO HARDCOURT WITH ROOF COVER & SHELTERED LINKWAYS BETWEEN BLOCK 291 AND 293 YISHUN STREET 22 (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $4 Million & above (C1)
05/04/201926/04/2019NEE SOON TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT NEE SOON TOWN FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARS FOR NEE SOON TOWN COUNCILExperienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor/Installer processed WSHC’s bizSAFE Level 3 & above are also eligible to participate
05/04/201930/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 766 TO 782 PASIR RIS STREET 71 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
05/04/201902/05/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 26 BLOCKS AT BLOCK 700 TO 725 PASIR RIS DRIVE 10 & PASIR RIS STREET 72 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
05/04/201930/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 30 BLOCKS AT BLOCK 736 TO 765 PASIR RIS DRIVE 10 & PASIR RIS STREET 71 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 13 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
05/04/201930/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 570 TO 586 PASIR RIS STREET 53 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
05/04/201902/05/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 26 BLOCKS AT BLOCK 626 TO 651 PASIR RIS DRIVE 1/3 & 10 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
05/04/201926/04/2019EAST COAST-FENGSHAN TOWN COUNCILUPGRADING OF 10 CHILDREN PLAYGROUND AND 3 ELDERLY FITNESS CORNERS AT BEDOK NORTH / BEDOK SOUTH, BEDOK CENTRAL AND NEW UPPER CHANGI ROAD FOR EAST COAST-FENGSHAN TOWN COUNCIL (CONTRACT PERIOD – 1 TO 4 SITES : 5 MONTHS / 5 TO 8 SITES : 6 MONTHS / 9 TO 13 SITES : 7 MONTHS)Sports, Recreational Equipment and Supplies (EPU/SPE/10) - $0.5 Million & above (S4)
05/04/201926/04/2019EAST COAST-FENGSHAN TOWN COUNCILCONSTRUCTION OF 2 NOS. COVERED LINKWAYS WITH DROP-OFF PORCHES AT BLOCK 119 AND BETWEEN BLOCK 128 & 129 BEDOK NORTH ROAD / STREET 2 (RE-TENDER) FOR EAST COAST-FENGSHAN TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $0.65 Million & above (C3)
28/03/201918/04/2019SEMBAWANG TOWN COUNCILPROPOSED UPGRADING OF WOODLANDS SPORTS PARK IN WOODLANDS DIVISIONGeneral Building (CW01) - $4 Million & above (C1)
22/03/201912/04/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF COVERED LINKWAYS, DROP-OFF POINTS AND BFA RAMPS; UPGRADING OF LINKWAYS, PAVILIONS, LINK BUILDINGS AND PARK SHELTERS, ROOF COVER OVER BFA RAMPS, OPEN HARDCOURT AND LIFT LOBBY IN SEMBAWANG GRC (RE-TENDER) FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $4 Million & above (C1)
22/03/201912/04/2019TANJONG PAGAR TOWN COUNCILUPGRADING OF 5 NOS. PLAYGROUNDS, 12 NOS. FITNESS CORNERS AND 1 NO. JOGGING TRACK FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 1 TO 4 SITES : 4 MONTHS / 5 TO 8 SITES : 5 MONTHS / 9 TO 12 SITES : 6 MONTHS / 13 SITES & ABOVE : 7 MONTHS)Sports, Recreational Equipment & Supplies (EPU/SPE/10) - $1 Million & above (S5)
22/03/201916/04/2019TANJONG PAGAR TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 80 & 81 STRATHMORE AVENUE AND BLOCK 143 & 145 TO 158 MEI LING STREET FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Electrical Engineering (ME05) - $4 Million & above (L3)
22/03/201912/04/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF COVERED BASKETBALL COURT, MULTI-GENERATION FITNESS CORNER, PLAYGROUND & JOGGING TRACK AT BLOCK 111 COMMONWEALTH CRESCENT FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $4 Million & above (C1)
22/03/201912/04/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF LINKWAYS / COVERED RAMPS / DROP-OFF PORCH AT BLOCKS 27, 40, 43 TELOK BLANGAH WAY / RISE, BLOCK 37A CAMBRIDGE ROAD, BLOCKS 91 TO 93 HENDERSON ROAD AND UPGRADING OF RESIDENTS’ CORNERS AT BLOCK 32 TELOK BLANGAH RISE AND BLOCK 672A KLANG LANE FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 11 MONTHS)General Building (CW01) - $4 Million & above (C1)
22/03/201912/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREPAIRS AND REDECORATION TO 34 BLOCKS AT BLOCK 736 TO 765, 738A, 741A, 754A AND 757B PASIR RIS DRIVE 10 / STREET 71 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Repairs & Redecoration (CR09) - $4 Million & above (L3) (Tenderers are required to furnish a joint warranty for the paintwork)
22/03/201912/04/2019EAST COAST-FENGSHAN TOWN COUNCILTERM CONTRACT FOR PROVISION OF EDITORIAL SERVICES, DESIGN, PRINTING AND PRODUCTION OF NEWSLETTERS FROM 1 JUL 2019 TO 30 JUN 2022 FOR EAST COAST-FENGSHAN TOWN COUNCILStationery & Printing and Photocopying Services (EPU/STA/10) OR Publishing & Bookbinding Services (EPU/SER/16) OR Advertising, Graphics Services (EPU/SER/18) - $0.25 Million & above (S3)
15/03/201905/04/2019PASIR RIS-PUNGGOL TOWN COUNCILUPGRADING OF EXISTING COVERED LINKWAYS FROM BLOCK 111, 113, 123D, 124, 190A & 190B, 193 & 194 TO BUS SHELTER RIVERVALE WALK, BLOCK 126, 127 TO BUS SHELTER RIVERVALE STREET, UPGRADING OF EXISTING HIGH AND LOW COVERED LINKWAYS FROM BLOCK 119A, 119D AND 144 TO BUS STOP RIVERVALE DRIVE FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
15/03/201905/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREROOFING WORKS TO 21 BLOCKS AT BLOCK 231 TO 251 PASIR RIS DRIVE 4 / STREET 21 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Waterproofing Installation (CR13) - $4 Million & above (L3)
15/03/201905/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 178, 178A-D, 180A-D, 181, 182, 182A, 185A-D, 186, 186A-D, 187A-B, 193, 194A, 194-197 RIVERVALE CRESCENT / DRIVE FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Repairs & Redecoration (CR09) - $4 Million & above (L3) (Tenderers are required to furnish a joint warranty for the paintwork)
15/03/201922/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL LOAD UPGRADING (ELU) AT BLOCKS 531 TO 562, 564 TO 569 PASIR RIS DRIVE 1 / STREET 51 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 30 MONTHS)General Building (CW01) - $13 Million & above (B2)
15/03/201905/04/2019PASIR RIS-PUNGGOL TOWN COUNCILENGAGEMENT OF WSH CONSULTANT TO CARRY OUT ASSESSMENT AND MAKE RECOMMENDATION FOR THE INSTALLATION OF THE SAFETY PROVISIONS AT ROOFTOPS OF EXISTING HDB BUILDINGS FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)The WSH Consultants must be from MOM’s approved listing for Learning Service Providers on Work-at-Height Course (Tenderers are required to produce the Certificate for the purchase of Tender Document)
08/03/201929/03/2019SEMBAWANG TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT SEMBAWANG GRC FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARS FOR SEMBAWANG TOWN COUNCILExperienced firm with relevant track records in digital media advertising and community communication platforms. Contractors who are without WSHC’s bizSAFE Level 3 but whose Sub-Contractor/Installer possessed WSHC’s bizSAFE Level 3 & above are also eligible to participate
08/03/201929/03/2019NEE SOON TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 150 TO 162, 165 TO 167, 170 TO 175 & 236 TO 242 YISHUN STREET 11 / RING ROAD IN CHONG PANG AND NEE SOON EAST DIVISIONS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Repairs & Redecoration (CR09) - $6.5 Million & above (L4) (Tenderers are required to furnish a joint warranty for the paintwork)
08/03/201929/03/2019PASIR RIS-PUNGGOL TOWN COUNCILUPGRADING OF 10 EXISTING COVERED LINKWAYS FROM BLOCK 200A & 201A TO BUS STOP SENGKANG EAST ROAD / COMPASSVALE DRIVE, BLOCK 200B TO BUS STOP SENGKANG EAST ROAD, BLOCK 203A & 203E TO BUS STOP COMPASSVALE ROAD, BLOCK 203B & 203C TO BUS STOP COMPASSVALE ROAD, BLOCK 204A TO BUS STOP COMPASSVALE DRIVE, BLOCK 207C TO 208 MSCP COMPASSVALE LANE, BLOCK 206A TO BUS STOP COMPASSVALE LANE, BLOCK 224D & 225C TO SENGKANG PRIMARY SCHOOL COMPASSVALE WALK, BLOCK 223D TO BUS STOP COMPASSVALE WALK AND BLOCK 135 EDGEDALE PLAINS TO MPH BLOCK 136 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
01/03/201922/03/2019PASIR RIS-PUNGGOL TOWN COUNCILTECHNICAL REFRESH OF EXISTING AVAYA PBX TELEPHONE SYSTEM OR PROPOSED NEW PBX TELEPHONE SYSTEM AND CONTACT CENTRE WITH 5-YEAR COMPREHENSIVE MAINTENANCE FOR PASIR RIS-PUNGGOL TOWN COUNCILExperienced Contractor with relevant track record
01/03/201922/03/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF 3 BANNER STRUCTURES, 20 DOUBLE-TIER BICYCLE RACKS AND UPGRADING COMMUNITY PAVILION / FOOTPATH IN SEMBAWANG GRC FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 4 MONTHS)General Building (CW01) - $0.65 Million & above (C3)
01/03/201922/03/2019NEE SOON TOWN COUNCILCONSTRUCTION AND UPGRADING OF 5 CHILDREN PLAYGROUNDS AND 3 FITNESS CORNERS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 1 TO 4 SITES : 5 MONTHS / 5 TO 8 SITES : 6 MONTHS / MORE THAN 9 SITES : 7 MONTHS)Sports, Recreational Equipment & Supplies (EPU/SPE/10) - $1.0 Million & above (S5)
01/03/201922/03/2019NEE SOON TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 816 TO 817, 819 TO 830, 832 TO 841, 844 TO 846 , 848 & 849 YISHUN STREET 81 / YISHUN RING ROAD IN NEE SOON SOUTH DIVISION FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Repairs & Redecoration (CR09) - $6.5 Million & above (L4) (Tenderers are required to furnish a joint warranty for the paintwork)
01/03/201922/03/2019NEE SOON TOWN COUNCILCONSTRUCTION OF 2 COVERED LINKWAYS AT BLOCK 784/785 & 848A/850, 4 DROP-OFF POINTS AT BLOCK 787, 788, 791 & 792 AND AWNINGS IN NEE SOON EAST AND NEE SOON SOUTH DIVISIONS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)General Building (CW01) - $4 Million & above (C1)
01/03/201922/03/2019NEE SOON TOWN COUNCILCONSTRUCTION OF 2 COMMUNITY GARDENS, 4 BANNER STRUCTURES, UPGRADING OF LIFT LOBBIES, LETTER BOXES, JOGGING TRACKS, FOOTPATHS AND TOILETS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
01/03/201928/03/2019NEE SOON TOWN COUNCILUPGRADING OF NEIGHBOURHOOD 8 PARK IN FRONT OF BLOCK 809 AND 810 YISHUN RING ROAD FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 7 MONTHS)General Building (CW01) - $4 Million & above (C1)
01/03/201922/03/2019NEE SOON TOWN COUNCILPAINTING TO VOID DECKS AND GROUND FLOOR STAIRCASES (LEADING TO 2ND STOREY) FOR BLOCKS IN NEE SOON TOWN FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 3 MONTHS)Repairs & Redecoration (CR09) - $1.3 Million & above (L2)
01/03/201922/03/2019NEE SOON TOWN COUNCILANCILLARY WORKS TO NRP FOR 30 BLOCKS AT BLOCK 816, 817, 819 TO 830, 832 TO 841, 844 TO 846, 848, 840A & 848A YISHUN STREET 81 / RING ROAD IN NEE SOON SOUTH DIVISION (PROPOSED UPGRADING OF EXISTING ACTIVE PARK TO 3-GENERATION PARK NEAR BLOCK 832/833 YISHUN STREET 81) FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)General Building (CW01) - $1.3 Million & above (C2)
20/07/201810/08/2018Pasir Ris-Punggol Town CouncilREPLACEMENT OF WATER PIPES TO 26 BLOCKS AT BLOCK 626-651 PASIR RIS DRIVE 1 / DRIVE 3 / DRIVE 10 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD -9 MONTHS)"Mechanical Engineering (ME11) OR Plumbing & Sanitary Works (ME12) - $0.65 Million & above (L 1) "
13/04/201804/05/2018Nee Soon Town CouncilDESIGN, SUPPLY AND DELIVERY OF LOW EMISSION INCENSE BURNERS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 8 WEEKS)General Building (CW 01) - $0.65 Million & above (C3) OR Fencing & Ironworks (CR04) - $0.65 Million & above (L 1) OR General Contractor with relevant track records
Closing Date Client Project Title Status
23/08/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF SPORTS PARK INCLUDE FUTSAL, BASKETBALL AND GAME COURTS AT BLOCK 108A CANBERRA WALK AND COVERED LINKWAY AT BLOCK 575 TO 573A WOODLANDS DRIVE 16 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
23/08/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR ENFORCEMENT WORKS AT COMMON PROPERTY FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR TAMPINES TOWN COUNCILPending Award
23/08/2019SEMBAWANG TOWN COUNCILSUPPLY AND INSTALLATION OF SAFETY PROVISIONS AT ROOFTOP OF EXISTING HDB BUILDINGS FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
20/08/2019NEE SOON TOWN COUNCIL REPLACEMENT OF WATER PIPES TO 4 BLOCKS AT BLOCK 104A, 104B, 253, 253A ANG MO KIO STREET 11 / STREET 21 FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Pending Award
20/08/2019SEMBAWANG TOWN COUNCILREPLACEMENT OF WATER PIPES TO 39 BLOCKS AT BLOCK 809, 810, 822, 823, 826, 827, 836, 839, 841, 844, 846, 851, 856-882 WOODLANDS STREET 81 / STREET 82 / STREET 83 / AVENUE 4 / AVENUE 9 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
16/08/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF SPORTS FACILITIES NEAR BLOCK 508C WELLINGTON CIRCLE ON STATE LAND IN SEMBAWANG DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Pending Award
07/08/2019MARSILING-YEW TEE TOWN COUNCIL UPGRADING OF 2 ELDERLY FITNESS CORNERS IN LIMBANG DIVISION (RE-TENDER) FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Pending Award
07/08/2019MARSILING-YEW TEE TOWN COUNCIL CONSTRUCTION OF 2 COVERED LINKWAYS, 1 AWNING AND 3 BFA RAMPS IN MARSILING DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
02/08/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF NEW COMMUNITY HALL AND UPGRADING TO EXISTING LINKWAY AT BLOCK 50 DORSET ROAD, NEW BFA RAMP / DROP-OFF PORCH / LINKWAY AT BLOCK 5 FARRER ROAD, BLOCK 171 STIRLING ROAD, BLOCK 125 BUKIT MERAH LANE 1, BLOCK 184 STIRLING ROAD, BLOCK 157 MEI LING STREET AND BLOCK 165 STIRLING ROAD, UPGRADING OF RESIDENTS’ CORNER AT BLOCK 161 MEI LING STREET AND FUNCTION CORNERS AT BLOCK 1A & 1F CANTONMENT ROAD FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
26/07/2019TANJONG PAGAR TOWN COUNCILANCILLARY WORKS TO NEIGHBOURHOOD RENEWAL PROGRAMME TO 9 BLOCKS AT BLOCKS 116, 117, 121, 123, 124A, 124B, 125, 126 AND 126A BUKIT MERAH VIEW CUM REPAIRS & REDECORATION TO 14 BLOCKS AT BLOCKS 116 TO 119, 120, 121, 123, 124A, 124B, 125, 126 AND 128 TO 130 BUKIT MERAH VIEW FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 18 MONTHS)Pending Award
19/07/2019HOLLAND-BUKIT PANJANG TOWN COUNCILAPPOINTMENT OF ARCHITECT FOR DEVELOPMENT OF CONCEPT MASTER PLANPending Award
19/07/2019TAMPINES TOWN COUNCILUPGRADING OF EXISTING BBQ PITS AT BLOCK 440, COMMUNITY GARDEN INCLUDING PROVISION OF STORAGE SPACE AT BLOCK 742, MULTI-PURPOSE COURT AT BLOCK 842, SENIOR CITIZENS’ CORNERS AT BLOCK 407 AND 161 TAMPINES STREET 43 / 72 / 82 / 41 / 12 AND CONSTRUCTION OF DROP-OFF POINT AT BLOCK 836/838 TAMPINES STREET 83 FOR TAMPINES TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
16/07/2019TANJONG PAGAR TOWN COUNCILELECTRICAL REWIRING TO 24 BLOCKS AT BLOCK 1, 2, 4, 6, 8, 9, 10 HOLLAND CLOSE/AVE, BLOCK 7 & 7A COMMONWEALTH AVE, BLOCK 81, 87 & 88 REDHILL LANE/ CLOSE, BLOCK 6, 122, 123, 125 & 201 KIM TIAN PLACE/ ROAD, BLOCK 101 & 104 HENDERSON CRESCENT & BLOCK 129 TO 133 CLARENCE LANE FOR TANJONG PAGAR TOWN COUNCIL (CONTRACT PERIOD – 13 MONTHS)Pending Award
12/07/2019SEMBAWANG TOWN COUNCILTERM CONTRACT FOR MONITORING AND MAINTENANCE SERVICES OF BURGLAR ALARM SYSTEM (BAS) INCLUDING FIRE DECENTRALIZED ALARM MONITORING (DECAM) FOR SEMBAWANG TOWN COUNCIL FOR THE PERIOD 1 AUG 2019 TO 31 MAR 2023Pending Award
02/07/2019JALAN BESAR TOWN COUNCILRENOVATION TO OFFICE AT BLOCK 70 GEYLANG BAHRU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 16 WEEKS)Pending Award
28/06/2019SEMBAWANG TOWN COUNCILREPAIRS AND REDECORATION TO 46 BLOCKS AT BLOCK 606 TO 611, 632 TO 640, 643 TO 658 WOODLANDS RING ROAD, BLOCK 612 TO 618 WOODLANDS AVENUE 4, BLOCK 677 TO 680 WOODLANDS AVENUE 6 AND BLOCK 744 TO 747 WOODLANDS CIRCLE IN WOODLANDS DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Pending Award
28/06/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR ELECTRICAL WORKS AND MAINTENANCE OF LIGHTING TO CARPARKS AND AMENITIES FOR THE PERIOD 1 OCT 2019 TO 31 MAR 2022 FOR TAMPINES TOWN COUNCILPending Award
28/06/2019MARSILING-YEW TEE TOWN COUNCIL REPAIRS AND REDECORATION TO 16 BLOCKS AT BLOCK 669 TO 676, 670A, 671A, 672A/B, 673A/B, 674A AND 676A CHOA CHU KANG CRESCENT IN YEW TEE DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 11 MONTHS)Awarded
28/06/2019MARSILING-YEW TEE TOWN COUNCIL UPGRADING OF 2 ELDERLY FITNESS CORNERS IN LIMBANG DIVISION FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Pending Award
28/06/2019SEMBAWANG TOWN COUNCILREPAIRS AND REDECORATION TO 51 BLOCKS AT BLOCK 753 TO 758 WOODLANDS AVENUE 4 (6 BLOCKS), BLOCK 759 TO 763 & 788 TO 793 WOODLANDS AVENUE 6 (11 BLOCKS), BLOCK 748 TO 752 WOODLANDS CIRCLE (5 BLOCKS), BLOCK 787B TO 788E & 774 TO 779 WOODLANDS CRESCENT (14 BLOCKS), BLOCK 769 TO 773 & 786B TO 786F WOODLANDS DRIVE 60 (10 BLOCKS) AND BLOCK 794 TO 798 WOODLANDS DRIVE 72 (5 BLOCKS) IN SEMBAWANG DIVISION FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 18 MONTHS)Awarded
28/06/2019SEMBAWANG TOWN COUNCILELECTRICAL REWIRING TO 37 BLOCKS AT BLOCK 822, 823, 826, 827, 836, 839, 841, 844, 846, 851 & 856 TO 882 WOODLANDS STREET 81 / 82 / 83 / AVENUE 4 / 9 FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Awarded
21/06/2019JALAN BESAR TOWN COUNCILREROOFING TO 10 BLOCKS AT BLOCK 804 TO 806 KING GEORGE’S AVENUE, BLOCK 231 TO 233 BAIN STREET, BLOCK 261 TO 264 WATERLOO STREET (KAMPONG GLAM DIVISION) FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Awarded
21/06/2019MARSILING-YEW TEE TOWN COUNCIL SUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AND OTHER HIGH TRAFFIC AREAS AT MARSILING-YEW TEE GRC FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARS FOR MARSILING-YEW TEE TOWN COUNCILPending Award
18/06/2019HOLLAND-BUKIT PANJANG TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANT TO 23 BLOCKS FOR BLOCK 177-180 LOMPANG ROAD, BLOCK 467, 470 SEGAR ROAD, BLOCK 607-609, 612, 617, 619-623, 650-656 SENJA ROAD / SENJA LINK / BUKIT PANJANG RING ROAD FOR HOLLAND–BUKIT PANJANG TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)Awarded
18/06/2019PASIR RIS-PUNGGOL TOWN COUNCILREPLACEMENT OF REFUSE HANDLING PLANTS TO 77 BLOCKS FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
14/06/2019PASIR RIS-PUNGGOL TOWN COUNCILCONSTRUCTION OF DROP-OFF PORCH AND BARRIER-FREE RAMP AT BLOCK 128C PUNGGOL FIELD WALK, HIGH & LOW LINKWAY AT BLOCK 184B TO 185B RIVERVALE CRESCENT, EXTENSION OF COVERED LINKWAY BETWEEN BLOCK 200B & 200D TO PAVILION SENGKANG EAST ROAD AND EXISTING DROP-OFF POINT AT BLOCK 206A COMPASSVALE LANE, UPGRADING OF SENIOR CITIZENS’ CORNER AT BLOCK 185C RIVERVALE CRESCENT, EXISTING SENIOR CITIZENS’ CORNER TO RESIDENTS’ CORNER AT BLOCK 200D SENGKANG EAST ROAD AND RESIDENTS’ CORNER AT BLOCK 203C COMPASSVALE ROAD FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Awarded
14/06/2019MARSILING-YEW TEE TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS IN MARSILING (N) AND MARSILING (S) FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR MARSILING-YEW TEE TOWN COUNCILAwarded
14/06/2019MARSILING-YEW TEE TOWN COUNCILREPLACEMENT OF WATER PIPES TO 12 BLOCKS AT BLOCK 401, 406, 408-410, 413-418 & 421 WOODLANDS STREET 41 FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Awarded
14/06/2019WEST COAST TOWN COUNCILSUPPLY, INSTALLATION, CONTENT PRODUCTION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT GROUND FLOOR LIFT LOBBIES OF HDB BLOCKS IN WEST COAST TOWN FOR 5 YEARS WITH OPTION TO EXTEND FOR ANOTHER 3 YEARS FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 5 MONTHS)Pending Award
13/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR CONSERVANCY & CLEANING WORKS FOR ZONES PR1, PR2, PR3, PR4 & SK1 FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022 FOR PASIR RIS-PUNGGOL TOWN COUNCILAwarded
13/06/2019JALAN BESAR TOWN COUNCILIMPROVEMENT TO OPEN SPACE BETWEEN BLOCK 2/3 UPPER BOON KENG ROAD AND BETWEEN BLOCK 1/3 ST GEORGE’S ROAD, CONSTRUCTION OF A THERAPEUTIC GARDEN BETWEEN BLOCK 72/93 GEYLANG BAHRU, A SHELTER OVER EXISTING BASKETBALL COURT NEAR BLOCK 4C ST GEORGE’S LANE, A JOGGING TRACK AND SEATING FACILITIES NEAR BLOCK 48 LOWER DELTA ROAD, UPGRADING OF EXISTING COMMUNITY HALL AT BLOCK 12A TAMAN HO SWEE, CONVERT EXISTING RESIDENTS’ CORNER TO SEATING AREA AT BLOCK 114 GEYLANG ROAD AND UPGRADING OF EXISTING SPORTS FACILITIES NEAR BLOCK 222 LORONG 8 TOA PAYOH FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
13/06/2019JALAN BESAR TOWN COUNCILCONSTRUCTION OF 6 COVERED WALKWAYS BETWEEN BLOCK 56/57 GEYLANG BAHRU, 49/63/51 SIMS PLACE / DRIVE, 45/46 BENDEMEER ROAD & 17/18 UPPER BOON KENG ROAD, FROM EXISTING WALKWAY AT BLOCK 2 JALAN KUKOH TO EXISTING PEDESTRIAN OVERHEAD BRIDGE AT HAVELOCK ROAD AND FROM BLOCK 1 JALAN KUKOH TO EXISTING COVERED WALKWAY AT BLOCK 2 JALAN KUKOH, UPGRADING OF EXISTING COVERED WALKWAY BETWEEN BLOCK 5 BANDA STREET AND BLOCK 4 SAGO LANE AND UPGRADING OF EXISTING ENTRANCE GATEWAY NEAR BLOCK 70 GEYLANG BAHRU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
12/06/2019SEMBAWANG TOWN COUNCILCONSTRUCTION / UPGRADING OF COVERED LINKWAYS, BFA RAMPS, DROP-OFF POINTS, LINK BUILDINGS, PAVILIONS, AWNINGS, HARDCOURTS, BBQ AREAS AND SENIOR CITIZEN CORNERS IN SEMBAWANG GRC FOR SEMBAWANG TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Pending Award
11/06/2019MARSILING-YEW TEE TOWN COUNCILELECTRICAL REWIRING TO 30 BLOCKS AT BLOCK 751 TO 771, 784 TO 792 CHOA CHU KANG NORTH 5 / 6 / STREET 54 / DRIVE FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 14 MONTHS)Pending Award
11/06/2019MARSILING-YEW TEE TOWN COUNCILELECTRICAL REWIRING TO 21 BLOCKS AT BLOCK 601 TO 621 CHOA CHU KANG STREET 62 / NORTH 7 FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
07/06/2019NEE SOON TOWN COUNCIL CONSTRUCTION AND UPGRADING OF 4 CHILDREN PLAYGROUNDS AND 2 FITNESS CORNERS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 1 TO 4 SITES : 5 MONTHS / 5 TO 8 SITES : 6 MONTHS)Pending Award
07/06/2019Marsiling-Yew Tee Town CouncilCONSTRUCTION / UPGRADING OF 2 COVERED LINKWAYS, 2 EXISTING PAVILIONS TO 1 COMMUNITY HALL, 1 EXISTING MULTI-PURPOSE HALL AND 3 BANNER STRUCTURES, INSTALLATION OF 13 NOTICE BOARDS AND 32 DOUBLE-TIER BICYCLE RACKS IN LIMBANG AND YEW TEE DIVISIONS FOR MARSILING-YEW TEE TOWN COUNCIL (CONTRACT PERIOD – 8 MONTHS)Pending Award
07/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR THE PROVISION OF WORKMEN FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCILPending Award
07/06/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR PROVISION OF SECURITY SERVICES FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2021 FOR PASIR RIS-PUNGGOL TOWN COUNCILAwarded
07/06/2019WEST COAST TOWN COUNCILCONSTRUCTION OF 8 HIGH/LOW LINKWAYS, 6 BICYCLE SHEDS, 1 RESIDENT’S CORNER, 1 DROP-OFF PORCH AT AYER RAJAH, WEST COAST AND PIONEER SMC FOR WEST COAST TOWN COUNCIL (CONTRACT PERIOD – 12 MONTHS)Pending Award
07/06/2019JALAN BESAR TOWN COUNCILUPGRADING / CONSTRUCTION OF STREET SOCCER COURTS NEAR BLOCK 8 NORTH BRIDGE ROAD & BLOCK 25 JALAN BERSEH, UPGRADING OF COMMUNITY GARDEN CUM PAVILION NEAR BLOCK 25 JALAN BERSEH, CONSTRUCT SHELTERED RAMPS AT BLOCK 635/637/638 VEERASAMY ROAD AND UPGRADING TO MULTI-PURPOSE HALL AT BLOCK 28A KELANTAN ROAD FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 9 MONTHS)Pending Award
07/06/2019NEE SOON TOWN COUNCIL CONSTRUCTION AND UPGRADING OF 4 DROP-OFF POINTS, 1 SHELTERED BBQ AREA, 2 COMMUNITY GARDENS, LOUVRES, BANNER STRUCTURES, FOOTPATH AND OPEN SPACES IN KEBUN BARU AND NEE SOON SOUTH DIVISIONS FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Pending Award
07/06/2019MARSILING-YEW TEE TOWN COUNCIL REROOFING TO 11 BLOCKS AT BLOCKS 107, 109, 111, 112, 114 TO 119 & 121 WOODLANDS STREET 13 & MARSILING RISE IN WOODGROVE DIVISION (CONTRACT PERIOD – 9 MONTHS)Awarded
07/06/2019NEE SOON TOWN COUNCIL CONSTRUCTION OF PAVILION WITH SEATING FACILITIES AND BBQ PITS AT OPEN SPACE IN FRONT OF BLOCK 770, SHELTERED BBQ CORNER WITH NEW FOOTPATH NEAR BLOCK 633/666, UPGRADING OF RESIDENT’S CORNER AT BLOCK 737 AND UPGRADING OF BLOCK DIRECTIONAL SIGNS IN NEE SOON CENTRAL FOR NEE SOON TOWN COUNCIL (CONTRACT PERIOD – 6 MONTHS)Pending Award
07/06/2019JALAN BESAR TOWN COUNCILUPGRADING OF RESIDENTS’ CORNERS AT BLOCK 102 & 105 JALAN RAJAH AND BLOCK 5 BOON KENG ROAD, DROP-OFF PORCH NEAR BLOCK 34/35 JALAN BAHAGIA, COMMUNITY PARK WITH FITNESS CORNER NEAR BLOCK 32/33 JALAN BAHAGIA, HARDCOURT, STAGE & COMMUNITY GARDEN NEAR BLOCK 111 MCNAIR ROAD AND CONSTRUCTION OF COMMUNITY GARDEN NEAR BLOCK 23 BENDEMEER ROAD, BBQ PITS / SEATING AREA NEAR BLOCK 101 JALAN RAJAH & BLOCK 76 LORONG LIMAU FOR JALAN BESAR TOWN COUNCIL (CONTRACT PERIOD – 10 MONTHS)Pending Award
04/06/2019SEMBAWANG TOWN COUNCILTERM CONTRACT FOR CONSERVANCY AND CLEANING WORKS FOR ZONES AR, CB, GB, SW & WL FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Awarded
31/05/2019JALAN BESAR TOWN COUNCILCONSTRUCTION OF 2 BANNER STRUCTURES AT BLOCK 112 & 113 LORONG 3 GEYLANG, IMPROVEMENT TO LIFT LOBBY / LANDING AT BLOCK 2A TO 2D, 3A TO 3D UPPER BOON KENG ROAD AND BLOCK 14 & 20 ST GEORGE’S ROAD AND REPLACEMENT OF EXISTING LETTERBOX AT HONG LIM COMPLEX BLOCK 531, 531A, 532, 533, 535, 536 AND 538 UPPER CROSS STREETPending Award
31/05/2019NEE SOON TOWN COUNCIL CONSTRUCTION OF 13 COVERED WALKWAYS AT BLOCK 118 TO EXISTING COVERED WALKWAY, 121 TO BUS STOP, 265, 269, 272, 272 TO CHONGFU PRIMARY SCHOOL SIDE GATE, 224/225, 236 TO LINK PAVILION, 241 TO BUS-STOP, 246/248, 257, 318C TO 316C AND 675C TO 675D, DROP-OFF POINT AT BLOCK 101 AND UPGRADING OF PRECINCT MARKER IN FRONT OF BLOCK 202/203 YISHUN RING ROAD / STREET 11 / STREET 21 / STREET 22 / AVENUE 4 / AVENUE 5 / AVENUE 9 IN CHONG PANG AND NEE SOON EAST DIVISIONSPending Award
31/05/2019WEST COAST TOWN COUNCILREPAIRS AND REDECORATION TO 50 BLOCKS AT BLOCK 617-637, 679A-C TO 686A-C JURONG WEST CENTRAL 1 / STREET 61 / 64 / 65, BLOCK 20 TO 23, 37A (MARKET / FOOD CENTRE) TEBAN GARDENS ROAD AND 9 LINK BUILDINGS / MPH AT BLOCK 624B, 627A, 631A, 680, 681, 683, 685 JURONG WEST CENTRAL 1 / STREET 61 / 64 / 65, BLOCK 20A, AND 21A TEBAN GARDENS ROADAwarded
24/05/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR CONSERVANCY AND CLEANING WORKS FOR ZONES CG & TE FOR THE PERIOD 1 OCT 2019 TO 30 SEP 2022Pending Award
24/05/2019TAMPINES TOWN COUNCILTERM CONTRACT FOR GRASSCUTTING, HORTICULTURE & ARBORICULTURE MAINTENANCE WORKS FOR THE PERIOD 1 OCT 2019 TO 31 MAR 2023 (ZONES 1 & 2)Awarded
24/05/2019PASIR RIS-PUNGGOL TOWN COUNCILPROVISION OF CONCEPTUALISATION, EDITORIAL, CREATIVE SERVICES, PRINTING AND DELIVERY OF NEWSLETTERS FOR THE PERIOD 1 JAN 2020 TO 31 DEC 2021Pending Award
24/05/2019EAST COAST-FENGSHAN TOWN COUNCILENGAGEMENT OF WSH CONSULTANT TO CARRY OUT ASSESSMENT AND MAKE RECOMMENDATION FOR THE INSTALLATION OF THE SAFETY PROVISIONS AT ROOFTOPS OF EXISTING HDB BUILDINGSAwarded
21/05/2019TANJONG PAGAR TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT TANJONG PAGAR TOWN FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 1 YEARAwarded
21/05/2019HOLLAND-BUKIT PANJANG TOWN COUNCILCONSTRUCTION / UPGRADING OF COVERED WALKWAYS, DROP-OFF PORCH, BFA RAMP AND STAIRCASE IN ZHENGHUA AND BUKIT TIMAH DIVISION (RETENDER)Awarded
17/05/2019NEE SOON TOWN COUNCIL SUPPLY OF ELECTRICITY TO 70 ACCOUNTS FOR THE PERIOD 1 JUL 2019 TO 31 DEC 2021Awarded
17/05/2019HOLLAND-BUKIT PANJANG TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCKS 152 TO 155, 163 TO 168, 533 TO 545, 601 TO 606 GANGSA / PETIR / JELAPANG / SENJA / BUKIT PANJANG RING ROAD IN CASHEW DIVISIONAwarded
10/05/2019NEE SOON TOWN COUNCIL UPGRADING OF EXISTING AMPHITHEATRE TO HARDCOURT WITH ROOF COVER & SHELTERED LINKWAYS BETWEEN BLOCK 291 AND 293 YISHUN STREET 22Awarded
02/05/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 26 BLOCKS AT BLOCK 700 TO 725 PASIR RIS DRIVE 10 & PASIR RIS STREET 72Awarded
02/05/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 26 BLOCKS AT BLOCK 626 TO 651 PASIR RIS DRIVE 1/3 & 10Awarded
30/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 30 BLOCKS AT BLOCK 736 TO 765 PASIR RIS DRIVE 10 & PASIR RIS STREET 71Awarded
30/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 570 TO 586 PASIR RIS STREET 53Awarded
30/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 766 TO 782 PASIR RIS STREET 71Awarded
26/04/2019EAST COAST-FENGSHAN TOWN COUNCILUPGRADING OF 10 CHILDREN PLAYGROUND AND 3 ELDERLY FITNESS CORNERS AT BEDOK NORTH / BEDOK SOUTH, BEDOK CENTRAL AND NEW UPPER CHANGI ROADPending Award
26/04/2019EAST COAST-FENGSHAN TOWN COUNCILCONSTRUCTION OF 2 NOS. COVERED LINKWAYS WITH DROP-OFF PORCHES AT BLOCK 119 AND BETWEEN BLOCK 128 & 129 BEDOK NORTH ROAD / STREET 2 (RE-TENDER)Awarded
26/04/2019NEE SOON TOWN COUNCIL SUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF LED DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT NEE SOON TOWN FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARSAwarded
22/04/2019PASIR RIS-PUNGGOL TOWN COUNCILELECTRICAL LOAD UPGRADING (ELU) AT BLOCKS 531 TO 562, 564 TO 569 PASIR RIS DRIVE 1 / STREET 51 FOR PASIR RIS-PUNGGOL TOWN COUNCIL (CONTRACT PERIOD – 30 MONTHS)Pending Award
18/04/2019SEMBAWANG TOWN COUNCILPROPOSED UPGRADING OF WOODLANDS SPORTS PARK IN WOODLANDS DIVISIONAwarded
16/04/2019TANJONG PAGAR TOWN COUNCILELECTRICAL REWIRING TO 17 BLOCKS AT BLOCK 80 & 81 STRATHMORE AVENUE AND BLOCK 143 & 145 TO 158 MEI LING STREETPending Award
12/04/2019EAST COAST-FENGSHAN TOWN COUNCILTERM CONTRACT FOR PROVISION OF EDITORIAL SERVICES, PRINTING AND PRODUCTION OF NEWSLETTERS FROM 1 JUL 2019 TO 30 JUN 2022Awarded
12/04/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF COVERED LINKWAYS, DROP-OFF POINTS AND BFA RAMPS; UPGRADING OF LINKWAYS, PAVILIONS, LINK BUILDINGS AND PARK SHELTERS, ROOF COVER OVER BFA RAMPS, OPEN HARDCOURT AND LIFT LOBBY IN SEMBAWANG GRC (RE-TENDER)Awarded
12/04/2019TANJONG PAGAR TOWN COUNCILUPGRADING OF 5 NOS. PLAYGROUNDS, 12 NOS. FITNESS CORNERS AND 1 NO. JOGGING TRACKPending Award
12/04/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF LINKWAYS / COVERED RAMPS / DROP-OFF PORCH AT BLOCKS 27, 40, 43 TELOK BLANGAH WAY / RISE, BLOCK 37A CAMBRIDGE ROAD, BLOCKS 91 TO 93 HENDERSON ROAD AND UPGRADING OF RESIDENTS’ CORNERS AT BLOCK 32 TELOK BLANGAH RISE AND BLOCK 672A KLANG LANEPending Award
12/04/2019TANJONG PAGAR TOWN COUNCILCONSTRUCTION OF COVERED BASKETBALL COURT, MULTI-GENERATION FITNESS CORNER, PLAYGROUND & JOGGING TRACK AT BLOCK 111 COMMONWEALTH CRESCENTPending Award
12/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREPAIRS AND REDECORATION TO 34 BLOCKS AT BLOCK 736 TO 765, 738A, 741A, 754A AND 757B PASIR RIS DRIVE 10 / STREET 71Awarded
14/12/2018NEE SOON TOWN COUNCIL Upgrading of Existing Hardcourt with Roof at Blk 107 Yishun Ring Road in Chong Pang DivisionAwarded
05/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 178, 178A-D, 180A-D, 181, 182, 182A, 185A-D, 186, 186A-D, 187A-B, 193, 194A, 194-197 RIVERVALE CRESCENT / DRIVEAwarded
05/04/2019PASIR RIS-PUNGGOL TOWN COUNCILENGAGEMENT OF WSH CONSULTANT TO CARRY OUT ASSESSMENT AND MAKE RECOMMENDATION FOR THE INSTALLATION OF THE SAFETY PROVISIONS AT ROOFTOPS OF EXISTING HDB BUILDINGSAwarded
05/04/2019PASIR RIS-PUNGGOL TOWN COUNCILREROOFING WORKS TO 21 BLOCKS AT BLOCK 231 TO 251 PASIR RIS DRIVE 4 / STREET 21Awarded
05/04/2019PASIR RIS-PUNGGOL TOWN COUNCILUPGRADING OF EXISTING COVERED LINKWAYS FROM BLOCK 111, 113, 123D, 124, 190A & 190B, 193 & 194 TO BUS SHELTER RIVERVALE WALK, BLOCK 126, 127 TO BUS SHELTER RIVERVALE STREET, UPGRADING OF EXISTING HIGH AND LOW COVERED LINKWAYS FROM BLOCK 119A, 119D AND 144 TO BUS STOP RIVERVALE DRIVEAwarded
29/03/2019NEE SOON TOWN COUNCIL REPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 150 TO 162, 165 TO 167, 170 TO 175 & 236 TO 242 YISHUN STREET 11 / RING ROAD IN CHONG PANG AND NEE SOON EAST DIVISIONSAwarded
29/03/2019PASIR RIS-PUNGGOL TOWN COUNCILUPGRADING OF 10 EXISTING COVERED LINKWAYS FROM BLOCK 200A & 201A TO BUS STOP SENGKANG EAST ROAD / COMPASSVALE DRIVE, BLOCK 200B TO BUS STOP SENGKANG EAST ROAD, BLOCK 203A & 203E TO BUS STOP COMPASSVALE ROAD, BLOCK 203B & 203C TO BUS STOP COMPASSVALE ROAD, BLOCK 204A TO BUS STOP COMPASSVALE DRIVE, BLOCK 207C TO 208 MSCP COMPASSVALE LANE, BLOCK 206A TO BUS STOP COMPASSVALE LANE, BLOCK 224D & 225C TO SENGKANG PRIMARY SCHOOL COMPASSVALE WALK, BLOCK 223D TO BUS STOP COMPASSVALE WALK AND BLOCK 135 EDGEDALE PLAINS TO MPH BLOCK 136Awarded
29/03/2019SEMBAWANG TOWN COUNCILSUPPLY, INSTALLATION, OPERATION, MANAGEMENT AND MAINTENANCE OF DIGITAL DISPLAY NOTICEBOARDS AT LIFT LOBBIES AT SEMBAWANG GRC FOR 5 YEARS WITH OPTION TO EXTEND ANOTHER 3 YEARSAwarded
28/03/2019NEE SOON TOWN COUNCIL UPGRADING OF NEIGHBOURHOOD 8 PARK IN FRONT OF BLOCK 809 AND 810 YISHUN RING ROADAwarded
22/03/2019SEMBAWANG TOWN COUNCILCONSTRUCTION OF 3 BANNER STRUCTURES, 20 DOUBLE-TIER BICYCLE RACKS AND UPGRADING COMMUNITY PAVILION / FOOTPATH IN SEMBAWANG GRCPending Award
22/03/2019NEE SOON TOWN COUNCIL CONSTRUCTION OF 2 COVERED LINKWAYS AT BLOCK 784/785 & 848A/850, 4 DROP-OFF POINTS AT BLOCK 787, 788, 791 & 792 AND AWNINGS IN NEE SOON EAST AND NEE SOON SOUTH DIVISIONSPending Award
22/03/2019NEE SOON TOWN COUNCIL CONSTRUCTION OF 2 COMMUNITY GARDENS, 4 BANNER STRUCTURES, UPGRADING OF LIFT LOBBIES, LETTER BOXES, JOGGING TRACKS, FOOTPATHS AND TOILETSPending Award
22/03/2019PASIR RIS-PUNGGOL TOWN COUNCILTECHNICAL REFRESH OF EXISTING AVAYA PBX TELEPHONE SYSTEM OR PROPOSED NEW PBX TELEPHONE SYSTEM AND CONTACT CENTRE WITH 5-YEAR COMPREHENSIVE MAINTENANCEAwarded
22/03/2019NEE SOON TOWN COUNCIL PAINTING TO VOID DECKS AND GROUND FLOOR STAIRCASES (LEADING TO 2ND STOREY) FOR BLOCKS IN NEE SOON TOWNPending Award
22/03/2019NEE SOON TOWN COUNCIL ANCILLARY WORKS TO NRP FOR 30 BLOCKS AT BLOCK 816, 817, 819 TO 830, 832 TO 841, 844 TO 846, 848, 840A & 848A YISHUN STREET 81 / RING ROAD IN NEE SOON SOUTH DIVISION (PROPOSED UPGRADING OF EXISTING ACTIVE PARK TO 3-GENERATION PARK NEAR BLOCK 832/833 YISHUN STREET 81)Awarded
22/03/2019NEE SOON TOWN COUNCIL CONSTRUCTION AND UPGRADING OF 5 CHILDREN PLAYGROUNDS AND 3 FITNESS CORNERSPending Award
22/03/2019NEE SOON TOWN COUNCIL REPAIRS AND REDECORATION TO 29 BLOCKS AT BLOCK 816 TO 817, 819 TO 830, 832 TO 841, 844 TO 846 , 848 & 849 YISHUN STREET 81 / YISHUN RING ROAD IN NEE SOON SOUTH DIVISIONAwarded
15/03/2019Marsiling-Yew Tee Town CouncilNRP ANCILLARY TENDER FOR APPLICATION OF FLOOR COATING TO APRON, VOID DECK AND COMMON CORRIDOR TO 24 BLOCKS AT BLOCKS 601 TO 621 AND 625 TO 627 CHOA CHU KANG STREET 62 / NORTH 7 IN YEW TEE DIVISIONAwarded
15/03/2019WEST COAST TOWN COUNCILCONSTRUCTION OF 2 COVERED LINKWAYS IN WEST COAST DIVISION AND 1 DRAIN FROM BLOCK 190 TO PUB DRAIN IN BOON LAY DIVISIONAwarded
15/03/2019Marsiling-Yew Tee Town CouncilCONSTRUCTION OF 2 COVERED WALKWAYS AT BLOCK 101/102 WOODLANDS STREET 13 AND BLOCK 899B TO 899C WOODLANDS DRIVE 50 AND CONSTRUCTION OF ROOF COVER TO REPLACE EXISTING TRELLIS WALKWAY AT MANDAI TEKONG PARK NEAR BLOCK 897C WOODLANDS DRIVE 50 IN WOODGROVE DIVISIONAwarded
15/03/2019HOLLAND-BUKIT PANJANG TOWN COUNCILTENDER FOR CONCEPTUALISATION, DESIGN, EDITORIAL, PRINTING & DELIVERY OF COMMEMORATIVE BOOKS (5 DIVISIONS)Awarded
08/03/2019Marsiling-Yew Tee Town CouncilCONSTRUCTION / UPGRADING OF 7 BFA RAMPS AND 20 BANNER STRUCTURES IN MARSILING DIVISIONAwarded
08/03/2019PASIR RIS-PUNGGOL TOWN COUNCILTERM CONTRACT FOR SANITARY, PLUMBING WORKS AND CLEANING & STERILIZATION OF WATER TANKS FOR THE PERIOD 1 JUN 2019 TO 31 MAR 2021Awarded
24/08/2018Holland-Bukit Panjang Town CouncilTerm Contract for Comprehensive Maintenance of Coin Operated Water Dispensers for The Period 1 Mar 2019 to 31 Mar 2022Awarded
22/05/2018Nee Soon Town CouncilRepairs & Redecoration to 29 Blocks at Block 701 to 712 and 753 to 769 Yishun Street 72 / Avenue 3 / 5 in Nee Soon Central DivisionPending Award
04/05/2018East Coast-Fengshan Town CouncilConstruction of Covered Linkway, Pavilion and Residents’ Corner at Block 26, 55 New Upper Changi and Block 40 Bedok South RoadAwarded
20/04/2018Jalan Besar Town CouncilCONSTRUCTION OF COVERED WALKWAY FROM BLOCK 52 TO 53 KENT ROAD, ADDITION OF CANOPY TO EXISTING COVERED WALKWAY BETWEEN BLOCK 815 KING GEORGE’S ROAD TO 816 JELLICOE ROAD, UPGRADING OF RESIDENTS’ CORNER AT BLOCK 76 LORONG LIMAU AND A SENIOR CITIZENS’ CORNER AT BLOCK 98 WHAMPOA DRIVE, CONSTRUCTION OF A BICYCLE SHED BETWEEN BLOCK 27/28 JALAN BAHAGIA AND A RAISED HUMP BETWEEN BLOCK 9/8B BOON KENG ROAD (CONTRACT PERIOD – 7 MONTHS)Awarded
06/04/2018East Coast-Fengshan Town CouncilANCILLARY WORK TO ELECTRICAL LOAD UPGRADING (ELU) WORKS AT SIMEI STREET / SIMEI ROADAwarded
02/04/2018East Coast-Fengshan Town CouncilCONSTRUCTION OF 2 NOS. COVERED LINKWAY WITH DROP-OFF PORCH AT BLOCK 119 AND BETWEEN BLOCKS 128 AND 129 BEDOK NORTH ROAD / STREET 2Awarded
02/04/2018Marsiling-Yew Tee Town CouncilCONSTRUCTION OF 2 COVERED LINKWAYS, 2 DROP-OFF POINTS, 1 OVERHEAD BRIDGE RAMP; UPGRADING OF 1 EXISTING AMPHITHEATRE AND 1 EXISTING BBQ PIT IN YEW TEE AND LIMBANG DIVISIONSAwarded
01/06/2018Sembawang Town CouncilUPGRADING WORKS NEAR BLOCK 303, 307, 309, 312, 313, 316 AND 317 CANBERRA ROAD / SEMBAWANG DRIVE / SEMBAWANG VISTA IN GAMBAS DIVISION (CONTRACT PERIOD – 10 MONTHS)Awarded
16/03/2018Holland - Bukit Panjang Town CouncilCONSTRUCTION / UPGRADING OF COVERED WALKWAYS, DROP-OFF PORCH, BFA RAMP AND STAIRCASE IN ZHENGHUA AND BUKIT TIMAH DIVISION (CONTRACT PERIOD – 8 MONTHS)Pending Award
16/03/2018Sembawang Town CouncilCONSTRUCTION OF COVERED LINKWAYS, DROP-OFF POINTS AND BFA RAMPS; UPGRADING OF LINKWAYS, PAVILIONS, LINK BUILDINGS AND PARK SHELTERS, ROOF COVER OVER BFA RAMPS, OPEN HARDCOURT AND LIFT LOBBY IN SEMBAWANG GRC (CONTRACT PERIOD – 10 MONTHS)Awarded
16/03/2018Sembawang Town CouncilCONSTRUCTION / UPGRADING OF BASKETBALL COURT, HARDCOURTS, COMMUNITY GARDENS, BANNER STRUCTURES, BBQ PIT AND PROVISION OF DOUBLE-TIER BICYCLE RACKS IN SEMBAWANG GRC (CONTRACT PERIOD – 7 MONTHS)Awarded
02/03/2018Sembawang Town CouncilREPLACEMENT / UPGRADING / INSTALLATION OF ILLUMINATED BLOCK SIGNS, RC NOTICE BOARDS IN SEMBAWANG GRC (CONTRACT PERIOD – 5 MONTHS)Awarded
08/12/2017Pasir Ris - Punggol Town CouncilUpgrading of Drop-Off Porches between Blocks 426 & 427 and at Blocks 423, 425 & 428 Pasir Ris Drive 6 (Contract Period – 8 Months)Awarded